Multiple Cities, Zip Codes, Addresses, Streets, Neighborhoods, MLS IDs
(separate each with the word OR)
Ex.Miami OR Coral Springs OR Boca Raton 33319 OR 33321 OR 33467
Please Click on a city to see properties that are organized by Zip Code for the selected city.
33981 - F10530570 - 15531 APPLEWHITE CIRCLE, Port Charlotte, FL 33981 62 Days on yellowkey
$535,000 | Single Family Home | 5 beds | 3.0 baths
Under Construction. Brand new concrete block single-family home featuring 5 spacious bedrooms and 3 full baths. Designed for versatility and comfort, the open-concept layout connects the kitchen, dining, and living areas seamlessly. Impact-resistant windows and doors, central air conditioning, and electric heating deliver safety and efficiency. Set on a 10,000 sq ft lot with mature native landscaping and a covered lanai for outdoor living. Flood zone AE compliant, tile flooring, municipal water/sewer services, and no HOA! Ideal for primary residence or investment. Estimated completion: October 15, 2025.
Listing is courtesy of: Beachfront Properties Real Estate LLC
33981 - F10530379 - 13438 MCINTOSH AVE, Port Charlotte, FL 33981 63 Days on yellowkey
$490,000 | Single Family Home | 4 beds | 2.5 baths
Discover your perfect home in Port Charlotte Golf Course community! This newly built 4-bedroom, 2.5-bath residence offers 2,129 square feet of beautifully designed living space. With modern finishes and thoughtful details throughout, this move-in-ready home is a rare find. Don’t miss the chance to experience the best in contemporary living!
33981 - F10530403 - 14265 Imlay Avenue, Port Charlotte, FL 33981 63 Days on yellowkey
Under Construction. Newly constructed single-story home featuring 5 bedrooms, 3 bathrooms, and an intelligent floor plan perfect for multi-generational living or remote work flexibility. Reinforced concrete block exterior, impact-rated windows and doors, and energy-efficient HVAC system offer both strength and savings. Situated in a non-HOA area, with public utilities and flood protection measures integrated. Completion expected by September 25, 2025.